Detached compact residence at 5302 Live Oak View Avenue with wood-framed glass doors

A Home With Its Own Daily Routines

An ADU brings a kitchen, bathroom, storage, and space for living and sleeping into a compact plan. The entrance and route from the street also need to work for the people using both homes.

We review window placement for privacy, utility routes for excavation and access, and cabinetry and appliance dimensions with your design team.

Construction With Your Architect

Already have ADU plans? We can review the construction scope with your architect and coordinate the site, utility, and building requirements that need to come together before construction.

Review the Property Before Choosing an Approach

The site, existing structures, utilities, and applicable review process affect the construction approach. The project team evaluates those requirements before treating a layout or location as settled.

Feasibility and approvals are property-specific.


Detached ADUs

A separate structure requires its own construction plan, including foundations, the building envelope, building systems, and utility connections. We review access for construction and how the entrance and outdoor areas relate to the main residence with your design team.

Attached ADUs and Conversions

An attached ADU or conversion depends on the existing building and proposed work. Structural conditions, floor levels, weather protection, and utility connections may need changes to support the independent home. Appropriately licensed professionals evaluate the required design and engineering before the construction approach is established.

Building Your Custom ADU

Property consultation for a custom ADU or home addition
Understand the Intended Use

We discuss who the space is for, how it needs to function, and what information is available about the property. We review the proposed unit type and the questions requiring professional evaluation.

Feasibility and plan coordination for an ADU or addition
Align the Plans and Construction Scope

The project team works through site access, utilities, design documents, and selections. The estimate identifies the proposed work, allowances, and items that still need to be resolved.

Moūnte DBS construction for a residential ADU or addition
Complete the Agreed Construction

The construction team coordinates trades, deliveries, installation details, and inspections. Connections to the existing property and any proposed changes are reviewed as the work develops.

Planning + Construction Coordination

If you are beginning with an idea, we can help define the construction questions and identify the professionals needed to evaluate the property and proposed unit. Where included in the project scope, interior design brings cabinetry, finish, fixture, and lighting selections into the project alongside construction planning. Architectural and engineering services are provided by appropriately licensed professionals. Your engagement defines the services and responsibilities included.

Contemporary Moūnte Studio home opening to a pool and outdoor living space

Questions About Custom ADUs

How is an ADU different from a home addition?

An ADU is an independent residence with living and sleeping space, a kitchen, and a bathroom. An addition expands the main home. The appropriate option depends on how you plan to use the space and what can be approved for the property.

Are ADU requirements the same in Altadena and Pasadena?

Both locations are subject to California ADU law, with applicable local requirements and review processes. Pasadena projects are reviewed by the City; Altadena projects are generally reviewed through Los Angeles County. We coordinate with the appropriate licensed professionals to understand what applies to your property and proposed unit.

Can an existing garage become an ADU?

A conversion must be evaluated around the existing structure, utilities, access, and applicable requirements. The presence of a garage does not establish that it can be converted as proposed.

How are utilities and access planned?

The project team reviews connections and service work with the relevant professionals and utilities. The scope also considers excavation, construction access, and interruptions to the main residence.

How are the cost and schedule established?

The unit type, existing conditions, site work, utilities, design, and selections affect the estimate. Investigations, approvals, procurement, and construction requirements affect timing. We develop a project-specific scope and schedule as the information becomes clearer, without promising eligibility or a fast approval.

Discuss Your Custom ADU

Tell us where the property is located, the type of unit you are considering, and whether you have plans.

We can discuss the construction questions that need to be answered for your site.

Considering a Custom ADU?

Start with a conversation about your property and what you’d like to build.